Part 1
Concepts and principles
Defines the core terms, roles and the information delivery cycle, including expectations for a common data environment, status codes and approval.
Information management structured to ISO 19650, the artefacts that govern an appointment, and the checks applied before anything is issued.
Information standards
ISO 19650 is the international standard series for managing information using BIM across the life cycle of built assets. BIMRACE structures delivery around its principles by default.
Part 1
Defines the core terms, roles and the information delivery cycle, including expectations for a common data environment, status codes and approval.
Part 2
The part most referenced in day-to-day practice. Covers information management during design and construction, and the artefacts that govern it.
Part 3
Information management during operation and maintenance, and the transition from a project information model to an asset information model.
Part 4
Process and decision criteria for individual information exchanges, including quality criteria for what is handed over.
Part 5
Applies where the sensitivity of the information requires protection — relevant to government, defence and critical infrastructure assets.
Part 6
The most recent addition to the series, covering the structuring of health and safety information.
On certification. BIMRACE structures its delivery to align with ISO 19650 principles. This is a statement of working method, not a claim of third-party certification to the standard. Where a project requires certified parties, we will say so at enquiry stage.
Working artefacts
These are the instruments that make information delivery auditable. They are agreed before authoring begins.
Quality assurance
01
File size and performance, warnings, unplaced and duplicated elements, worksets, links and shared coordinate integrity.
02
Naming, classification, view and sheet organisation, parameter completeness against the agreed level of information need.
03
Origin and orientation, level and grid alignment, discipline model alignment, tolerance against the coordination datum.
04
Required parameters populated, schedules reconciling, exported data validating against the exchange requirement.
05
Open clashes reviewed, resolutions re-tested, decisions recorded against a tracked issue list with an owner.
06
Correct status code and revision, correct formats, deliverable list reconciled against the delivery plan before upload.
In development
Alongside delivery work, BIMRACE is developing an internal platform that reads model information and assists with review, checking and reporting.
It is described here as work in progress because that is what it is. It is not a released product, it is not available for licence, and nothing on this site should be read as a commitment to a feature or a date.
The reason it exists is the same reason we model information-first: once a model's data is structured and reliable, a large share of routine checking stops needing a person to do it by hand.
Platform architecture
Project enquiry
Share a scope, a drawing set or an information requirement. You will get a considered response on approach, disciplines, deliverables and timeline — not a generic brochure.